This kind of gusset plate can be installed go up in keel, return the effect that can have cloak conduit. 这种扣板可以安装在龙骨上,还能起到遮掩管道的作用。
Analysis of the influence of the gusset plate to the braced frame structure with pinned connections 支撑节点板对铰接支撑框架体系的影响
Design and checking on the gusset plate connecting the web member with the chord member in staggered truss structure systems 交错桁架中弦杆与腹杆连接节点板的设计与验算
Study on the Mechanical Behavior of the Gusset Plate in Staggered-truss Structure Systems under Loading 交错桁架结构体系中节点的受力性能研究
Compressive behavior and ultimate strength of gusset plate contacted with single angle 单角钢螺栓连接节点板受压性能及极限承载力研究
The gusset plate calculation of boiler steel structure is very important during the designation. 锅炉钢结构连接计算是设计中非常重要的一个阶段。
Lateral torsional buckling of gusset plate; Shade is one kind of horizontal outside shading. 遮阳板属于水平外遮阳。
A Study for Gusset Plate Mechanical Characters of Heavy Vehicles 'Frame 载重汽车车架连接板的力学特征研究
Optimal searching for technological parameter of forming process of ABS gusset plate ABS扣板注射成型工艺参数优化分析
Stress Concentration in K-joints of Tube-gusset with Plate Connections 节点板连接K型钢管节点的应力集中
Experimental Research on Cold-Formed Thin-Walled C Steel Beam-Column Joints of Connections with Gusset Plate 冷弯薄壁C型钢组合梁柱加腋连接板节点试验研究
The gusset plate with chamfers connection usually used in beam to column. 加腋钢板连接由于构造简单,传力可靠,常用于梁柱连接节点。
Stress test and calculation of gusset plate of crane truss girder 吊车桁架节点板应力测试和分析计算
Gusset Plate Calculation of Boiler Steel Structure 锅炉钢结构节点板的计算
The whole course analysis of failure behavior of tube-gusset joint in steel tubular tower gold plate 钢管塔中管-板连接节点的破坏全过程分析
Two kinds of joint model are compared, type one is nomal diaphragm, type two is reinforced in the lateral of gusset plate, force transmission of structure and stress conditions of components are analyzed. 模拟结构的受力情况,对于普通横隔板的模型一和拼接板外侧加强的模型二两种构造的节点进行对比。分析结构内部的传力情况和构件的应力情况。
The bridge node structure is in the form of the integral node: the gusset plate assembled at the factory prior to welding, and then go down to the gusset plate between the "plug" and the main truss rod. 该桥的节点构造形式采用了整体式节点技术即:节点板事先在工厂拼装焊接成型,然后再往整体节点板上拼装主桁等杆件。